Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,634
matching recommendationsSIC | 4952 | Sewerage Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0099 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,698 | $17,843 | Implemented |
DL0099 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,410 | $100 | Implemented |
DL0099 # 05 Y:2012 | 05 | 2012 | USE OPTIMUM TEMPERATURE | $2,940 | $100 | Implemented |
DL0099 # 06 Y:2012 | 06 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $320,000 | $3,600,000 | Not Implemented |
OR0595 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $13,800 | $8,370 | Implemented |
OR0595 # 02 Y:2012 | 02 | 2012 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $39,919 | $200,000 | Not Implemented |
OR0595 # 03 Y:2012 | 03 | 2012 | RECOVER MECHANICAL ENERGY | $1,034 | $780 | Implemented |
OR0595 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,290 | $9,500 | Not Implemented |
OR0595 # 05 Y:2012 | 05 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,312 | $4,888 | Implemented |
SD0451 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $35,395 | $14,332 | Implemented |
SD0451 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,815 | $17,500 | Not Implemented |
SD0451 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,577 | $2,373 | Implemented |
SD0451 # 04 Y:2012 | 04 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,240 | $9,000 | Not Implemented |
SD0451 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $134,300 | $455,000 | Not Implemented |
SD0452 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $48,619 | $2,000 | Implemented |
SD0452 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,957 | $15,925 | Implemented |
SD0452 # 03 Y:2012 | 03 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,072 | $18,680 | Not Implemented |
SD0452 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,223 | $4,200 | Implemented |
SD0452 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,098 | $275,000 | Implemented |
SF0415 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $77,652 | $5,000 | Not Implemented |
SF0415 # 02 Y:2012 | 02 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,634 | $8,163 | Implemented |
SF0415 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $136,139 | $189,204 | Implemented |
SF0415 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,606 | $11,795 | Not Implemented |
SF0415 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $3,106 | $10,756 | Implemented |
SF0415 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,582 | $28,175 | Implemented |