Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 4953 | Refuse Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0322 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,809 | $9,182 | Not Implemented |
MZ0322 # 02 Y:2021 | 02 | 2021 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $61,530 | $226,000 | Not Implemented |
WV0611 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $29 | Implemented |
WV0611 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $1,213 | Not Implemented |
WV0611 # 06 Y:2021 | 06 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $830 | $4,080 | Not Implemented |
WV0611 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,003 | $761 | Implemented |
WV0611 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,767 | $2,029 | Not Implemented |
WV0611 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,803 | $3,254 | Implemented |
WV0611 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,923 | $240 | Implemented |
WV0611 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,448 | $734 | Implemented |
MZ0304 # 02 Y:2021 | 02 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,323 | $185,555 | Not Implemented |
MZ0304 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $466 | $250 | Not Implemented |
MZ0304 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $22,541 | $0 | Not Implemented |
MZ0304 # 01 Y:2021 | 01 | 2021 | USE EXISTING DAM TO GENERATE ELECTRICITY | $83,325 | $120,377 | Not Implemented |
UU0182 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,360 | $920 | Implemented |
UU0182 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $5,611 | $2,229 | Not Implemented |
UU0182 # 04 Y:2021 | 04 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,301 | $172,000 | Not Implemented |
UU0182 # 03 Y:2021 | 03 | 2021 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $94,872 | $621,000 | Not Implemented |
UU0182 # 02 Y:2021 | 02 | 2021 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $301,212 | $427,040 | Implemented |
UU0182 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $358,314 | $840,585 | Implemented |