IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

240

matching recommendations
Reset
SIC 50 Wholesale Trade
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0533 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $291 $600 Implemented
AS0533 # 06 Y:2022 06 2022 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $243 $852 Not Implemented
AM0869 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $56,855 $1,012,500 n/a
AM0869 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $57,664 $468,000 n/a
AM0869 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,141 $137,722 n/a
IC0248 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,758 $258 Not Implemented
IC0248 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,328 $349 Not Implemented
IC0248 # 05 Y:2021 05 2021 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,297 $0 Implemented
IC0248 # 04 Y:2021 04 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $724 $712 Implemented
IC0248 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $94,808 $23,408 Not Implemented
IC0248 # 02 Y:2021 02 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,744 $0 Implemented
IC0248 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,148 $4,150 Not Implemented
BS0133 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $389 $420 Not Implemented
BS0133 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,413 $1,850 Not Implemented
BS0133 # 01 Y:2020 01 2020 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,424 $2,090 Not Implemented
IC0217 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,543 $6,600 Implemented
IC0217 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,588 $1,928 Not Implemented
IC0217 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,925 $300 Implemented
IC0217 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62,274 $210,000 Not Implemented
IC0217 # 05 Y:2019 05 2019 BURN WOOD BY-PRODUCTS FOR HEAT $5,683 $15,144 Implemented
IC0217 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,967 $7,769 Implemented
WM0054 # 02 Y:2014 02 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,524 $330 Implemented
WM0054 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,363 $2,000 Not Implemented
WM0054 # 03 Y:2014 03 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,335 $10,000 Not Implemented
WM0054 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $1,764 $6,315 Not Implemented