IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0401 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $253 $570 Not Implemented
MS0401 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,376 $6,600 Not Implemented
LS1022 # 01 Y:2022 01 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,456 $0 Implemented
LS1022 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,565 $88 Implemented
LS1022 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $270 Implemented
LS1022 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $248 $50 Implemented
LS1022 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,202 $12,065 Implemented
LS1022 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,544 $66,750 Implemented
LS1022 # 07 Y:2022 07 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,344 $218,400 Implemented
WM0178 # 01 Y:2022 01 2022 USE SYNTHETIC LUBRICANT $4,241 $8,000 Not Implemented
WM0178 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $2,564 Implemented
WM0178 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $189 $0 Implemented
WM0178 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $154 $0 Implemented
WM0178 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $139 $0 Implemented
WM0178 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $120 $500 Not Implemented
LS1022 # 09 Y:2022 09 2022 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,599 $16,545 Not Implemented
LS1022 # 08 Y:2022 08 2022 REPLACE BOILER $186,054 $504,000 Implemented
BS0152 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $71,968 $162,000 Not Implemented
BS0152 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $60,903 $7,355 Not Implemented
BS0152 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $414 Not Implemented
BS0152 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,503 $8,301 Not Implemented
BS0152 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,594 $114,156 Not Implemented
GT0949 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $1,392 $5,106 Not Implemented
GT0949 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,422 $400 Not Implemented
GT0949 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,159 $451 Implemented