Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 701 | Hotels And Motels |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ1015 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO HEAT WATER | $3,319 | $23,760 | n/a |
MZ1015 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,677 | $4,600 | n/a |
MZ1015 # 06 Y:2025 | 06 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,010 | $8,640 | n/a |
MZ1015 # 07 Y:2025 | 07 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,409 | $3,750 | n/a |
MZ1015 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,316 | $5,000 | n/a |
MZ1015 # 05 Y:2025 | 05 | 2025 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $789 | $0 | n/a |
MZ1015 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,776 | $6,332 | n/a |
MZ1015 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $517 | $496 | n/a |
MS0427 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,714 | $131,059 | n/a |
MS0427 # 01 Y:2024 | 01 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,989 | $14,159 | n/a |
MS0427 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $963 | $1,105 | n/a |
UU0243 # 06 Y:2024 | 06 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,800 | $6,300 | Implemented |
UU0243 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,900 | $6,000 | Implemented |
UU0243 # 03 Y:2024 | 03 | 2024 | COVER OPEN TANKS | $9,190 | $7,340 | Implemented |
UU0243 # 02 Y:2024 | 02 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $15,800 | $13,000 | Not Implemented |
UU0243 # 01 Y:2024 | 01 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $26,330 | $19,500 | Implemented |
UU0243 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,244 | $14,145 | Not Implemented |
UU0243 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,631 | $22,338 | Not Implemented |
LS2023 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,548 | $14,800 | Implemented |
LS2023 # 04 Y:2023 | 04 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $6,749 | $10,831 | Not Implemented |
LS2023 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $189,746 | $142,240 | Not Implemented |
LS2023 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $56,174 | $1,000 | Implemented |
LS2023 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $3,665 | $1,400 | Not Implemented |
LS2023 # 06 Y:2023 | 06 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $193,754 | $552,840 | Implemented |
LS2023 # 07 Y:2023 | 07 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $17,898 | $60,000 | Not Implemented |