IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 72 Personal Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0529 # 06 Y:2015 06 2015 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $1,950 $5,000 Implemented
MA0730 # 01 Y:2014 01 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,229 $5,000 Not Implemented
MA0730 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,618 $4,285 Implemented
MA0730 # 03 Y:2014 03 2014 REDUCE VENTILATION AIR $1,607 $4,600 Implemented
MA0730 # 04 Y:2014 04 2014 REDUCE VENTILATION AIR $524 $1,300 Not Implemented
MA0730 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $478 $300 Implemented
MA0730 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $426 $1,200 Not Implemented
DL0117 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $3,345 $500 Not Implemented
DL0117 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,922 $5,695 Implemented
DL0117 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,400 $6,000 Not Implemented
DL0117 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $138,552 $277,104 Not Implemented
DL0117 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $23,476 $5,870 Implemented
UM0409 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,058 $1,200 Not Implemented
UM0409 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,590 $10,000 Not Implemented
UM0409 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,300 $5,000 Not Implemented
UM0409 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $4,324 $3,000 Not Implemented
UM0409 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,652 $6,000 Not Implemented
SF0376 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $397 $535 Implemented
SF0376 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,155 $110,307 Implemented
SF0376 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,011 $6,725 Implemented
SF0376 # 04 Y:2009 04 2009 AVOID FROST FORMATION ON EVAPORATORS $2,865 $9,600 Implemented
SF0376 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,149 $75,000 Implemented
SF0376 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,348 $20,943 Not Implemented
DL0022 # 01 Y:2008 01 2008 OPERATE BOILERS ON HIGH FIRE SETTING $10,038 $0 Implemented
DL0022 # 02 Y:2008 02 2008 MINIMIZE WATER USAGE $18,580 $10,000 Implemented