IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 721 Laundry, Cleaning, & Garment Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0281 # 02 Y:2022 02 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $24,436 $109,567 n/a
TT0281 # 09 Y:2022 09 2022 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,000 $25 n/a
TT0281 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $58,911 $10,000 n/a
TT0281 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $63 n/a
TT0281 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $1,876 $2,748 n/a
TT0281 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,188 $560 n/a
TT0281 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $12,034 $44,013 n/a
TT0281 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $5,133 $6,000 n/a
TT0281 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,821 $4,500 n/a
TT0281 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $2,740 n/a
LS1906 # 07 Y:2019 07 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $145,606 $704,000 Not Implemented
LS1906 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,705 $15,900 Not Implemented
LS1906 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $44 $40 Not Implemented
LS1906 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,230 $16,552 Not Implemented
LS1906 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $3,895 $1,125 Not Implemented
LS1906 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,667 $315 Not Implemented
LS1906 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,228 $50 Not Implemented
WV0551 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,726 $1,000 Implemented
WV0551 # 11 Y:2017 11 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $33 Implemented
WV0551 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $447 $1,000 Implemented
WV0551 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $466 $2,000 Not Implemented
WV0551 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $866 $595 Implemented
WV0551 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,417 $1,346 Implemented
WV0551 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,421 $14,500 Implemented
WV0551 # 01 Y:2017 01 2017 INSTALL SENSORS TO DETECT AND AVOID JAMS $12,866 $7,175 Not Implemented