IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 82 Educational Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1422 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,400 $11,760 Not Implemented
LS1422 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,392 $5,200 Not Implemented
LS1322 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,827 $100 Implemented
LS1322 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $747 $375 Implemented
LS1322 # 03 Y:2022 03 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,493 $3,200 Not Implemented
LS1322 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,044 $31,514 Implemented
OK1039 # 01 Y:2021 01 2021 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $361 $570 Implemented
OK1039 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $3,438 Implemented
OK1039 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $421 $488 Implemented
OK1039 # 04 Y:2021 04 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,960 $4,835 Not Implemented
UU0174 # 01 Y:2021 01 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $24,060 $178,852 Implemented
UU0174 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,383 $85,347 Implemented
UU0174 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $5,107 $43,420 Not Implemented
UU0174 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $200 Implemented
UU0174 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $476 $1,925 Not Implemented
UU0165 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $7,045 $7,045 Not Implemented
UU0165 # 02 Y:2020 02 2020 REDUCE VENTILATION AIR $4,090 $1,125 Not Implemented
UU0165 # 03 Y:2020 03 2020 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,520 $7,400 Not Implemented
UU0165 # 04 Y:2020 04 2020 AIR CONDITION ONLY SPACE NECESSARY $1,220 $1,500 Implemented
UU0165 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $660 $660 Implemented
UU0165 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $660 Not Implemented
UU0162 # 01 Y:2020 01 2020 REDUCE FLUID FLOW RATES $8,259 $17,871 Implemented
UU0162 # 02 Y:2020 02 2020 UPGRADE OBSOLETE EQUIPMENT $5,390 $7,024 Not Implemented
UU0162 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,096 $5,759 Implemented
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented