IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 87 Engineering & Management Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1105 # 05 Y:2024 05 2024 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $98 $240 Implemented
OK1105 # 02 Y:2024 02 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $946 $2,625 Implemented
MUCM06 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $419 $742 Implemented
MUCM06 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $281 $0 Implemented
MUCM06 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $934 Implemented
MUCM06 # 02 Y:2022 02 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,378 $0 Implemented
MS0398 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,227 $6,769 Implemented
LS1622 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,928 $6,120 Implemented
LS1622 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,718 $350 Implemented
LS1522 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $59,902 $3,750 Implemented
LS1522 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,079 $33,425 Implemented
MS0395 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,723 $18,748 Implemented
MS0395 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $540 Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
OR0723 # 03 Y:2019 03 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,360 $1,789 Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
LS0001 # 07 Y:2017 07 2017 PAY UTILITY BILLS ON TIME $343 $0 Implemented
LS0001 # 05 Y:2017 05 2017 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $430 $380 Implemented
LS0001 # 03 Y:2017 03 2017 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $520 $1,200 Implemented
LS0001 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,143 $420 Implemented
BD0434 # 01 Y:2013 01 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $48,621 $13,862 Implemented
BD0434 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,272 $1,475 Implemented
BD0434 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,463 $1,425 Implemented
BD0434 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,169 $11,159 Implemented