Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,016

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0622 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $6,341 Implemented
CO0742 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,833 $2,733 Implemented
CO0742 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $1,478 $359 Implemented
CO0742 # 04 Y:2021 04 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,318 $16,143 Implemented
LS2206 # 01 Y:2022 01 2022 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,066 $10 Implemented
LS2206 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,014 $25 Implemented
LS2206 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,034 $630 Implemented
LS2206 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $336 $250 Implemented
LS2206 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,272 $2,688 Implemented
UU0196 # 01 Y:2022 01 2022 CHECK FOR ACCURACY OF UTILITY / POWER METERS $10,923 $250 Implemented
UU0196 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,732 $7,647 Implemented
UU0196 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,096 $323 Implemented
UU0196 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $750 Implemented
UU0196 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $510 $640 Implemented
TT0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $3,967 Implemented
LS2205 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,208 $100 Implemented
LS2205 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $483 $50 Implemented
LS2205 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $778 $135 Implemented
LS2205 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,916 $3,142 Implemented
CW0120 # 03 Y:2021 03 2021 USE BATTERY STORAGE FOR DEMAND CONTROL $18,089 $25,885 Implemented
CW0120 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,965 $510 Implemented
CW0120 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $899 $0 Implemented
CW0120 # 08 Y:2021 08 2021 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $217 $86 Implemented
UA0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,396 $17,269 Implemented
UA0249 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $320 $20 Implemented