IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,819

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0379 # 03 Y:1992 03 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,637 $750 Implemented
UD0380 # 02 Y:1992 02 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,532 $3,452 Implemented
UD0380 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,531 $0 Implemented
UD0381 # 02 Y:1992 02 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $10,472 $10,000 Implemented
UF0044 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $336 Implemented
UF0044 # 03 Y:1992 03 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,172 $3,140 Implemented
UF0044 # 04 Y:1992 04 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,480 $500 Implemented
UF0044 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $22 $100 Implemented
UF0044 # 07 Y:1992 07 1992 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $341 $0 Implemented
WI0155 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,747 $500 Implemented
WI0157 # 04 Y:1992 04 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,601 $0 Implemented
WI0158 # 02 Y:1992 02 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,154 $0 Implemented
WI0158 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,382 $0 Implemented
WI0158 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $663 $2,555 Implemented
WI0159 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,224 $500 Implemented
WI0159 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $646 Implemented
WI0160 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,046 $500 Implemented
AM0161 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $630 Implemented
AM0161 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,855 $0 Implemented
AM0161 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,290 $985 Implemented
AM0161 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,420 $0 Implemented
AM0161 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Implemented
AM0161 # 08 Y:1992 08 1992 INSTALL TIMERS AND/OR THERMOSTATS $280 $450 Implemented
AS0067 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $793 $6,684 Implemented
AS0067 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,648 $6,290 Implemented