IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,034

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0116 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $308 $0 Implemented
IP0116 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,878 $14,599 Implemented
IP0116 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $117,376 $1,431,096 Implemented
AM0776 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,200 $60,000 Implemented
AM0776 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $2,000 Implemented
AM0776 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,155 $38 Implemented
AM0776 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,244 $0 Implemented
AM0776 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $100 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
SF0536 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,886 $0 Implemented
SF0536 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,261 $16,688 Implemented
TT0215 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $15,764 $1,150 Implemented
MZ0268 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $720 Implemented
MZ0268 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102,897 $152,035 Implemented
MZ0268 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $25,560 $24,500 Implemented
IC0212 # 01 Y:2019 01 2019 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $59,063 $2,920 Implemented
UU0148 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $292,277 $82,400 Implemented
UU0148 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205,559 $25,240 Implemented
UU0148 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,667 $8,267 Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented
UF0525 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,084 $4,798 Implemented