IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,509

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 Implemented
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 Implemented
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 Implemented
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 Implemented
UW2414 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $37,019 $162,415 Implemented
UW2414 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,737 $25,000 Implemented
UW2414 # 08 Y:2024 08 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,539 $52,000 Implemented
UW2414 # 04 Y:2024 04 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $92,758 $115,000 Implemented
UW2414 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $812 $1,219 Implemented
UW2414 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $220 Implemented
OR0801 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $15,143 $44,093 Implemented
OR0801 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,786 $5,438 Implemented
UW2413 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,582 $7,250 Implemented
UW2413 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $53 $229 Implemented
UW2413 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,186 $5,713 Implemented
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 Implemented
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 Implemented
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 Implemented
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 Implemented
WV0671 # 13 Y:2024 13 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $176 Implemented
WV0671 # 12 Y:2024 12 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $799 $1,648 Implemented
WV0671 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $3,020 $1,180 Implemented
WV0671 # 08 Y:2024 08 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,623 $1,200 Implemented
WV0671 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $3,901 $6,364 Implemented
WV0671 # 06 Y:2024 06 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,058 $5,330 Implemented