IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,054

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0307 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,777 $23,135 Implemented
MI0307 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,347 $1,660 Implemented
MI0307 # 07 Y:2017 07 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,323 $1,720 Implemented
MI0307 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,536 $3,370 Implemented
MI0307 # 13 Y:2017 13 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $692 $240 Implemented
MI0307 # 14 Y:2017 14 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $359 $40 Implemented
MA0771 # 01 Y:2017 01 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,141 $1,000 Implemented
MA0771 # 03 Y:2017 03 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $527 $2,116 Implemented
IP0081 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,110 $0 Implemented
IP0081 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,216 $0 Implemented
IP0081 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $72 $0 Implemented
IP0081 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,798 $35 Implemented
IP0081 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,865 $390 Implemented
IP0081 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,358 Implemented
IP0081 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $201 $409 Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
NC0591 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,408 $87,579 Implemented
NC0591 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,501 $4,590 Implemented
NC0591 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $52 $100 Implemented
NC0591 # 04 Y:2017 04 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,474 $24,000 Implemented
NC0591 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
UK1613 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,671 $0 Implemented