Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142,519
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0609 # 07 Y:2023 | 07 | 2023 | USE OPTIMUM THICKNESS INSULATION | $8,652 | $21,442 | n/a |
SF0609 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,153 | $9,827 | n/a |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | n/a |
CI0023 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,738 | $658,288 | n/a |
CI0023 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $45,480 | $17,533 | n/a |
CI0023 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $13,894 | $30,000 | n/a |
CI0023 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,902 | $300 | n/a |
CI0023 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $7,791 | $2,625 | n/a |
CI0023 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,881 | $2,299 | n/a |
CI0023 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,670 | $7,500 | n/a |
CI0023 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,797 | $5,000 | n/a |
LS2023 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $56,174 | $1,000 | n/a |
LS2023 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $3,665 | $1,400 | n/a |
LS2023 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $189,746 | $142,240 | n/a |
LS2023 # 04 Y:2023 | 04 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $6,749 | $10,831 | n/a |
LS2023 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,548 | $14,800 | n/a |
LS2023 # 06 Y:2023 | 06 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $193,754 | $552,840 | n/a |
LS2023 # 07 Y:2023 | 07 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $17,898 | $60,000 | n/a |
AS0564 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,294 | $1,654 | n/a |
AS0564 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,752 | $63 | n/a |
AS0564 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,251 | $143 | n/a |
AS0564 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $945 | $110 | n/a |
AS0564 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $463 | $71 | n/a |
AS0564 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,388 | $182,064 | n/a |
UF0602 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $848,231 | $3,118,500 | n/a |