IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,291

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0624 # 05 Y:2019 05 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,555 $2,000 Not Implemented
UA0205 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,908 Implemented
UA0205 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $51,026 $98,308 Not Implemented
UA0205 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,422 $18,747 Not Implemented
UA0205 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,670 $1,600 Not Implemented
AM0770 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $28,900 $38,900 Not Implemented
AM0770 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,150 $2,050 Implemented
AM0770 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,260 $27,700 Implemented
AM0770 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $8,810 $11,400 Not Implemented
AM0770 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,940 $9,940 Not Implemented
AM0770 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $675 Implemented
AM0770 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $500 Implemented
AM0770 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $794 $0 Not Implemented
AM0770 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $90 Not Implemented
AM0770 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $300 $0 Not Implemented
AM0770 # 11 Y:2019 11 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $175 $0 Not Implemented
OK0997 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,994 $49,087 Not Implemented
OK0997 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $17,569 $1,795 Implemented
OK0997 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,052 $14,332 Not Implemented
OK0997 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,415 $2,668 Implemented
OK0997 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,238 $0 Implemented
OK0997 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,715 $1,306 Implemented
OK0997 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,032 $0 Implemented
OK0997 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $0 Implemented
OK0997 # 09 Y:2019 09 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $663 $2,640 Not Implemented