IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,724

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0327 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,649 $16,300 Not Implemented
MZ0327 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $61,626 $574,750 Not Implemented
MZ0327 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,801 $6,385 Not Implemented
MZ0327 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,903 $17,890 Implemented
MZ0327 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,999 $25,044 Not Implemented
GT0960 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,810 $1,850 Implemented
GT0960 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,573 $800 Implemented
GT0960 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,666 $8,719 Implemented
GT0960 # 04 Y:2021 04 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,614 $149,000 Not Implemented
GT0960 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $175,754 $2,009,756 Not Implemented
UD1039 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55 $0 Not Implemented
UD1039 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,123 $714 Not Implemented
UD1039 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $306 $202 Not Implemented
UD1039 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,423 $5,000 Not Implemented
UD1039 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $316 Not Implemented
UD1039 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,654 $50 Not Implemented
UD1039 # 07 Y:2022 07 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,304 $2,369 Not Implemented
UF0579 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,152 $105,185 Implemented
UF0579 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $36,661 $30,359 Implemented
UF0579 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,557 $36,000 Implemented
UF0579 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,945 $25,600 Not Implemented
UF0579 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $5,294 $10,558 Implemented
UF0579 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,095 $12,753 Implemented
UF0579 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $2,079 $5,093 Not Implemented
UF0579 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,003 $0 Implemented