IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,738

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1032 # 01 Y:2022 01 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $58,668 $25,875 Not Implemented
UD1032 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,757 $0 Not Implemented
UD1032 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $10,000 Not Implemented
UD1032 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,929 $100,000 Implemented
UD1032 # 05 Y:2022 05 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,725 $4,661 Not Implemented
UD1032 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
UD1032 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $19,725 $23,544 Not Implemented
UD1032 # 08 Y:2022 08 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $351,582 $1,000,000 Not Implemented
MZ0319 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $687 $800 Implemented
MZ0319 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,278 $240 Implemented
MZ0319 # 03 Y:2021 03 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,002 $600 Implemented
MZ0319 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,762 $4,140 Implemented
MZ0319 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,286 $480 Implemented
MZ0319 # 06 Y:2021 06 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $13,167 $45,756 Implemented
MZ0319 # 07 Y:2021 07 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $22,855 $145,659 Not Implemented
MZ0319 # 08 Y:2021 08 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,401 $25,720 Implemented
MZ0319 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,480 $3,480 Not Implemented
MI0397 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $2,751 $480 Not Implemented
MI0397 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $4,555 Not Implemented
MI0397 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,631 $40 Implemented
MI0397 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,589 $480 Not Implemented
WM0169 # 01 Y:2021 01 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,165 $21,350 Not Implemented
WM0169 # 02 Y:2021 02 2021 USE SYNTHETIC LUBRICANT $4,530 $3,000 Not Implemented
WM0169 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,251 $0 Not Implemented
WM0169 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,969 $4,800 Implemented