Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,747
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $8 | Not Implemented |
UF0354 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,587 | $63,488 | Implemented |
UF0354 # 02 Y:2004 | 02 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $19,414 | $0 | Implemented |
UF0354 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,795 | $62,620 | Not Implemented |
UF0354 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,169 | $745 | Not Implemented |
UF0354 # 05 Y:2004 | 05 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $7,962 | $31,000 | Implemented |
UF0354 # 06 Y:2004 | 06 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,140 | $779 | Not Implemented |
UF0354 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,543 | $0 | Implemented |
UF0354 # 08 Y:2004 | 08 | 2004 | ADD AREA LIGHTING SWITCHES | $2,354 | $11,495 | Not Implemented |
AM0475 # 12 Y:2004 | 12 | 2004 | INSULATE BARE EQUIPMENT | $450 | $60 | Not Implemented |
AM0475 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,740 | $425 | Implemented |
AM0475 # 09 Y:2004 | 09 | 2004 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,600 | $12,500 | Not Implemented |
AM0475 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,490 | $900 | Implemented |
AM0475 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,290 | $400 | Not Implemented |
AM0475 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,020 | $33 | Implemented |
AM0475 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,100 | $300 | Implemented |
AM0475 # 04 Y:2004 | 04 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,170 | $4,600 | Not Implemented |
AM0475 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $500 | Implemented |
AM0475 # 02 Y:2004 | 02 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,800 | $700 | Implemented |
AM0475 # 01 Y:2004 | 01 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $19,000 | $650 | Implemented |
GT0794 # 09 Y:2004 | 09 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,609 | $0 | Implemented |
GT0794 # 08 Y:2004 | 08 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,773 | $4,900 | Not Implemented |
GT0794 # 07 Y:2004 | 07 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $729 | $1,500 | Not Implemented |
GT0794 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,490 | $2,500 | Implemented |
GT0794 # 05 Y:2004 | 05 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,022 | $3,380 | Not Implemented |