IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,581

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0275 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $5,736 $3,400 Not Implemented
TN0275 # 02 Y:1986 02 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,746 $10,000 Not Implemented
TN0275 # 03 Y:1986 03 1986 REDESIGN PROCESS $6,722 $17,900 Not Implemented
TN0275 # 04 Y:1986 04 1986 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,462 $12,675 Not Implemented
TN0275 # 05 Y:1986 05 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,628 $375 Implemented
TN0275 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,571 $1,300 Implemented
TN0276 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $4,831 $95 Implemented
TN0276 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,515 $5,000 Not Implemented
TN0276 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $566 $1,851 Implemented
TN0276 # 05 Y:1986 05 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $746 $3,600 Not Implemented
TN0276 # 06 Y:1986 06 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $373 $500 Implemented
TN0276 # 07 Y:1986 07 1986 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $122 $600 Implemented
TN0276 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $45 Implemented
AT0037 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,704 $2,411 Implemented
AT0037 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $79 Implemented
AT0037 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,902 $300 Implemented
AT0037 # 04 Y:1986 04 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $3,940 $5,000 Implemented
AT0037 # 05 Y:1986 05 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,009 $2,000 Implemented
MA0057 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $2,500 Implemented
MA0057 # 02 Y:1986 02 1986 REDUCE GLAZED AREAS IN BUILDINGS $3,959 $8,455 Implemented
MA0057 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $377 $300 Implemented
MA0057 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,512 $0 Not Implemented
MA0057 # 05 Y:1986 05 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $2,262 $7,500 Implemented
MA0058 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $90 Implemented
MA0058 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $3,740 $5,760 Implemented