IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,893

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0011 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $389 $96 Implemented
OR0011 # 03 Y:1987 03 1987 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,474 $0 Not Implemented
OR0011 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,519 $1,536 Implemented
OR0011 # 05 Y:1987 05 1987 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,969 $3,600 Not Implemented
OR0011 # 06 Y:1987 06 1987 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,103 $3,000 Not Implemented
OR0011 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,024 $1,092 Implemented
OR0011 # 08 Y:1987 08 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $777 $746 Implemented
UD0245 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $5,160 $500 Implemented
UD0245 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,498 $1,600 Implemented
UD0245 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $329 $425 Implemented
UD0245 # 04 Y:1988 04 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,625 $6,000 Not Implemented
UD0246 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,261 $0 Implemented
UD0246 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,946 $100,000 Implemented
UD0246 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,694 $32,400 Implemented
UD0246 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $4,414 $3,400 Implemented
UD0246 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,171 $4,000 Not Implemented
WI0008 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $562 $0 Not Implemented
WI0008 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $0 Implemented
WI0008 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $644 $701 Implemented
WI0008 # 04 Y:1987 04 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $122 $0 Implemented
WI0008 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,563 $5,000 Not Implemented
WI0008 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $695 $500 Implemented
WI0009 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $15,779 $0 Not Implemented
WI0009 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $284 $0 Implemented
WI0009 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $5,373 Implemented