IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,893

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0324 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $2,990 $1,400 Implemented
GT0324 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,078 $17,060 Not Implemented
GT0324 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,220 $1,780 Implemented
GT0324 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $520 $1,883 Implemented
GT0321 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,760 $250 Implemented
GT0321 # 02 Y:1987 02 1987 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $9,000 $1,900 Not Implemented
GT0321 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $381 $325 Implemented
GT0321 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,150 $2,500 Implemented
WI0003 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $2,645 $0 Not Implemented
WI0003 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,286 $0 Implemented
WI0003 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,383 $573 Implemented
WI0003 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $398 Implemented
WI0003 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $724 $2,000 Not Implemented
WI0003 # 06 Y:1987 06 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $570 $1,600 Not Implemented
OR0002 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $300 Implemented
OR0002 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,568 $550 Not Implemented
OR0002 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,563 $4,730 Not Implemented
OR0002 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $4,962 $7,398 Implemented
OR0002 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $970 Implemented
OR0003 # 01 Y:1987 01 1987 USE MINIMUM STEAM OPERATING PRESSURE $486 $0 Implemented
OR0003 # 02 Y:1987 02 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,365 $45 Implemented
OR0003 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $2,130 $447 Implemented
OR0003 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $432 $190 Implemented
OR0003 # 06 Y:1987 06 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $246 Implemented
OR0003 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $632 Not Implemented