IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,911

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0481 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,696 $14,000 Not Implemented
LE0481 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $42,460 $57,500 Not Implemented
LE0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $11,688 Implemented
LE0481 # 05 Y:2019 05 2019 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $50,429 $162,000 Implemented
LE0481 # 06 Y:2019 06 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $842 $3,200 Not Implemented
LE0481 # 07 Y:2019 07 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,688 $55,000 Implemented
LE0481 # 08 Y:2019 08 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,376 $10,000 Not Implemented
LE0481 # 09 Y:2019 09 2019 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,850 Implemented
AM0785 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $620 $20 Implemented
AM0785 # 09 Y:2019 09 2019 INSTALL SKYLIGHTS $440 $0 Not Implemented
AM0785 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $18,920 Implemented
AM0785 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,880 $2,000 Implemented
AM0785 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $4,685 $6,865 Implemented
AM0785 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $460 Not Implemented
AM0785 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $1,340 $5,250 Not Implemented
AM0785 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $650 Not Implemented
UU0154 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $567,696 $2,355,000 Not Implemented
UU0154 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $262,908 $2,299,950 Not Implemented
UU0154 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170,761 $461,313 Implemented
UU0154 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,288 $2,040 Implemented
UU0154 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $10,215 $3,044 Implemented
UU0154 # 06 Y:2019 06 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,947 $2,000 Not Implemented
MI0358 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $713,110 $8,242,656 Implemented
MI0358 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $478,275 $6,028,646 Implemented
MI0358 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $270,674 $806,400 Implemented