IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,575

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0387 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,753 $460 Not Implemented
WV0387 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,520 $28 Implemented
MA0644 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $34,492 $160,000 Implemented
MA0644 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,900 $0 Implemented
MA0644 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $11,580 $25,000 Implemented
MA0644 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,097 $37,500 Not Implemented
MA0644 # 05 Y:2009 05 2009 REDUCE VENTILATION AIR $6,015 $2,600 Implemented
MA0644 # 06 Y:2009 06 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,937 $0 Implemented
UA0032 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,663 $0 Implemented
UA0032 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,535 $3,000 Implemented
UA0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,243 $220,339 Implemented
UA0032 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,487 $162 Not Implemented
UA0032 # 05 Y:2009 05 2009 INSTALL TIMERS AND/OR THERMOSTATS $4,594 $680 Not Implemented
UA0032 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $19,240 $2,900 Implemented
UA0032 # 07 Y:2009 07 2009 USE MINIMUM SAFE OVEN VENTILATION $3,687 $4,300 Implemented
UW0024 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,517 $48,000 Implemented
UW0024 # 02 Y:2009 02 2009 USE POWER DURING OFF-PEAK PERIODS $4,202 $400 Not Implemented
UW0024 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $0 Implemented
UW0024 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $0 Implemented
AM0556 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $110,800 $325,000 Not Implemented
AM0556 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,000 $36,100 Implemented
AM0556 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $1,000 Implemented
AM0556 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,510 $21,230 Not Implemented
AM0556 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,650 $11,713 Implemented
AM0556 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,980 $3,900 Not Implemented