IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,983

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0188 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $2,849 $248 Not Implemented
KU0188 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,183 $900 Implemented
KU0188 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,400 $4,600 Implemented
KU0188 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,097 $100 Not Implemented
KU0188 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $255 $0 Not Implemented
KU0189 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,480 $6,000 Implemented
KU0189 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,071 $8,000 Implemented
KU0189 # 03 Y:1986 03 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,597 $500 Not Implemented
KU0189 # 04 Y:1986 04 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,273 $5,000 Not Implemented
KU0189 # 05 Y:1986 05 1986 USE MINIMUM STEAM OPERATING PRESSURE $775 $0 Implemented
KU0189 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $485 $0 Not Implemented
KU0189 # 07 Y:1986 07 1986 INSULATE BARE EQUIPMENT $2,648 $5,000 Not Implemented
KU0189 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,247 $780 Implemented
KU0189 # 09 Y:1986 09 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,871 $6,700 Not Implemented
KU0189 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $414 Implemented
KU0189 # 11 Y:1986 11 1986 REPAIR AND ELIMINATE STEAM LEAKS $191 $200 Implemented
KU0189 # 12 Y:1986 12 1986 IMPROVE LUBRICATION PRACTICES $148 $260 Not Implemented
MA0053 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $8,920 $8,800 Not Implemented
MA0053 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $850 Not Implemented
MA0053 # 03 Y:1986 03 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $250 Not Implemented
MA0053 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,047 $190 Not Implemented
MA0053 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,381 $30 Not Implemented
MA0053 # 06 Y:1986 06 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $25,584 $22,400 Not Implemented
MA0053 # 07 Y:1986 07 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,447 $7,700 Not Implemented
MA0053 # 08 Y:1986 08 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,022 $35,300 Not Implemented