IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0279 # 06 Y:1999 06 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $493 $1,754 Not Implemented
ME0279 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,720 $6,216 Implemented
ME0279 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,824 $900 Not Implemented
ME0279 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,800 $0 Implemented
ME0279 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $36,509 $13,360 Implemented
UF0237 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,848 $2,526 Not Implemented
UF0237 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,280 $81,187 Not Implemented
UF0237 # 03 Y:1999 03 1999 REDESIGN PROCESS $418,000 $141,700 Not Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $297,462 $167,000 Not Implemented
KU0536 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,240 $23,220 n/a
KU0536 # 02 Y:1999 02 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $8,260 $37,800 n/a
KU0536 # 01 Y:1999 01 1999 REPLACE BOILER $10,770 $29,000 n/a
KU0536 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $40 n/a
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
KU0536 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $5,290 n/a
MS0150 # 05 Y:1999 05 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,004 $43 Implemented
MS0150 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $273 $1,643 Not Implemented
MS0150 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $1,230 $2,025 Not Implemented
MS0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $350 Implemented
MS0150 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $1,283 $708 Not Implemented
NV0145 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,002 $27,320 Not Implemented
NV0145 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,000 Implemented