IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,087

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0522 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $2,200 $6,200 Not Implemented
AM0522 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,600 $250 Implemented
AM0522 # 05 Y:2007 05 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $810 $0 Not Implemented
AM0522 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $245 Implemented
AM0522 # 07 Y:2007 07 2007 INSTALL SKYLIGHTS $760 $1,760 Not Implemented
AM0522 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $200 Not Implemented
AM0522 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $440 $0 Not Implemented
AM0522 # 10 Y:2007 10 2007 USE SYNTHETIC LUBRICANT $150 $0 Not Implemented
BD0318 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,326 $1,140 Not Implemented
BD0318 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $304 $675 Not Implemented
BD0318 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $6,945 $1,200 Not Implemented
BD0318 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,077 $1,077 Implemented
BD0318 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $600 Not Implemented
BD0318 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $319 $480 Not Implemented
MS0308 # 01 Y:2007 01 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $8,320 $2,753 Implemented
MS0308 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,951 $8,190 Implemented
MS0308 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,541 $142 Implemented
MS0308 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,356 $2,850 Implemented
MA0609 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,854 $54,000 Not Implemented
MA0609 # 02 Y:2007 02 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $11,356 $40,000 Not Implemented
MA0609 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,050 $5,000 Not Implemented
MA0609 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,398 $19,100 Not Implemented
MA0609 # 05 Y:2007 05 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,871 $7,500 Not Implemented
MA0609 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,436 $2,200 Not Implemented
MA0609 # 07 Y:2007 07 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,227 $3,200 Not Implemented