Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67,047
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0825 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,860 | $5,000 | Implemented |
AM0825 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $8,070 | $4,250 | Implemented |
UU0187 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $1,470 | Implemented |
OK1051 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,640 | $7,393 | Implemented |
OK1051 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,614 | $677 | Implemented |
LE0510 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,017 | $17,100 | Implemented |
LE0510 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,926 | $45,000 | Implemented |
LE0510 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,951 | $30,000 | Implemented |
LE0510 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,170 | $21,000 | Implemented |
LE0510 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,899 | $12,800 | Implemented |
LE0510 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,653 | $100,000 | Implemented |
LE0510 # 08 Y:2021 | 08 | 2021 | REPLACE BOILER | $334,294 | $1,800,000 | Implemented |
MA0825 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $93,702 | $30,000 | Implemented |
MA0825 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $54,067 | $150,000 | Implemented |
MA0825 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,012 | $52,945 | Implemented |
LS2107 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $425 | $25 | Implemented |
LS2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,148 | $450 | Implemented |
LS2107 # 03 Y:2021 | 03 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $981 | $250 | Implemented |
LS2107 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,971 | $5,165 | Implemented |
OK1049 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $820 | Implemented |
OK1049 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,589 | $0 | Implemented |
OK1049 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,601 | $1,060 | Implemented |
MI0388 # 03 Y:2021 | 03 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,022 | $38,081 | Implemented |
MI0388 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $31,640 | $80 | Implemented |
MI0388 # 05 Y:2021 | 05 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $13,798 | $4,080 | Implemented |