IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,691

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0129 # 09 Y:1991 09 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $790 $1,430 Implemented
OR0129 # 10 Y:1991 10 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,172 $0 Implemented
OR0129 # 11 Y:1991 11 1991 OPTIMIZE PLANT POWER FACTOR $12,146 $26,250 Implemented
OR0129 # 12 Y:1991 12 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $952 $2,150 Implemented
OR0129 # 13 Y:1991 13 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,521 $15,000 Implemented
OR0129 # 14 Y:1991 14 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,227 $64,975 Implemented
OR0130 # 01 Y:1991 01 1991 INSTALL SET-BACK TIMERS $1,778 $225 Implemented
OR0130 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $450 $800 Implemented
OR0130 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,399 $4,936 Implemented
OR0130 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $1,647 $3,450 Implemented
OR0130 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $75 $157 Implemented
OR0130 # 07 Y:1991 07 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,347 $3,453 Implemented
OR0130 # 08 Y:1991 08 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $292 $881 Implemented
RU0126 # 03 Y:1991 03 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,998 $5,000 Implemented
RU0126 # 04 Y:1991 04 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,736 $3,372 Implemented
RU0126 # 05 Y:1991 05 1991 ISOLATE HOT OR COLD EQUIPMENT $2,183 $3,500 Implemented
RU0127 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $2,985 $1,200 Implemented
RU0127 # 02 Y:1991 02 1991 ISOLATE HOT OR COLD EQUIPMENT $1,965 $450 Implemented
RU0127 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,708 $0 Implemented
RU0127 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $830 Implemented
RU0128 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,552 $0 Implemented
RU0128 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $42 Implemented
RU0128 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,753 $800 Implemented
RU0128 # 04 Y:1991 04 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,320 $0 Implemented
RU0128 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $630 $169 Implemented