IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66,788

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0191 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $721 $200 Implemented
OK0191 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $224 $92 Implemented
OK0192 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,057 $3,500 Implemented
OK0192 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,547 $32,800 Implemented
ST0054 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,436 $100 Implemented
ST0054 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 Implemented
ST0054 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,651 $537 Implemented
ST0054 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,335 $2,057 Implemented
ST0054 # 06 Y:1986 06 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $139,451 $20,000 Implemented
ST0055 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $571 Implemented
ST0055 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $731 $0 Implemented
ST0055 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,219 $10,500 Implemented
ST0055 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $417 $250 Implemented
ST0055 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $626 $0 Implemented
ST0055 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $3,750 Implemented
ST0055 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $834 $2,400 Implemented
TN0275 # 05 Y:1986 05 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,628 $375 Implemented
TN0275 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,571 $1,300 Implemented
TN0276 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $4,831 $95 Implemented
TN0276 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $566 $1,851 Implemented
TN0276 # 06 Y:1986 06 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $373 $500 Implemented
TN0276 # 07 Y:1986 07 1986 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $122 $600 Implemented
TN0276 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $45 Implemented
UD0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,942 $7,500 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented