IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66,782

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0130 # 18 Y:1984 18 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $150 $0 Implemented
KU0130 # 19 Y:1984 19 1984 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $262 $0 Implemented
KU0130 # 20 Y:1984 20 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $105 $0 Implemented
MA0002 # 01 Y:1984 01 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,889 $200 Implemented
MA0002 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,893 $0 Implemented
MA0003 # 01 Y:1984 01 1984 REPAIR OR REPLACE STEAM TRAPS $14,697 $0 Implemented
MA0003 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $655 $384 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
TN0212 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,487 $400 Implemented
TN0212 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,547 $500 Implemented
TN0212 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $1,503 $498 Implemented
TN0217 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $24,926 $1,300 Implemented
TN0217 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $22,604 $1,425 Implemented
TN0217 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,424 $1,200 Implemented
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
UD0132 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,478 $500 Implemented
UD0132 # 03 Y:1984 03 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $698 $1,436 Implemented
UD0132 # 04 Y:1984 04 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $823 $0 Implemented
UD0133 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $1,754 $1,271 Implemented
UD0133 # 04 Y:1984 04 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $3,629 $6,000 Implemented
UD0134 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $32,600 $10,000 Implemented
UD0134 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,306 $0 Implemented
UD0134 # 03 Y:1984 03 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,339 $10,000 Implemented