IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,554

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0109 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,244 $0 Not Implemented
SU0109 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28 $0 Implemented
SU0109 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $1,123 $213 Implemented
SU0109 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,246 $662 Implemented
SU0109 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,828 $30 Implemented
SU0109 # 06 Y:2001 06 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $982 $0 Not Implemented
OR0402 # 01 Y:2001 01 2001 UPGRADE OBSOLETE EQUIPMENT $53,000 $45,000 Implemented
OR0402 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $1,310 $1,100 Not Implemented
OR0402 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $3,600 Not Implemented
IC0022 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,251 $12,135 Not Implemented
IC0022 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,542 $2,500 Implemented
IC0022 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $5,334 $820 Not Implemented
IC0022 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,800 $3,280 Not Implemented
MS0192 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,415 $443 Implemented
MS0192 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,993 $1,000 Implemented
MS0192 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,056 $50 Implemented
MS0192 # 04 Y:2001 04 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,924 $510 Not Implemented
MS0192 # 05 Y:2001 05 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,153 $3,127 Implemented
UU0017 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $1,815 Not Implemented
UU0017 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $694 $700 Implemented
UU0017 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $220 Implemented
MA0500 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,575 $350,000 Not Implemented
MA0500 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,719 $45,000 Not Implemented
MA0500 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,719 $20,000 Not Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented