Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,988
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0202 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,233 | $827 | Not Implemented |
IP0202 # 06 Y:2024 | 06 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,924 | $1,309 | Not Implemented |
IP0202 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $21,856 | $5,952 | Not Implemented |
IP0202 # 08 Y:2024 | 08 | 2024 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $99,783 | $28,120 | Not Implemented |
IP0202 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,012 | $11,226 | Not Implemented |
IP0202 # 10 Y:2024 | 10 | 2024 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $752 | $700 | Not Implemented |
IP0202 # 11 Y:2024 | 11 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,920 | $1,969 | Not Implemented |
IP0202 # 12 Y:2024 | 12 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $743 | $2,940 | Not Implemented |
UC2416 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,662 | $1,600 | n/a |
UC2416 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $159,604 | $5,236 | n/a |
UC2416 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,767 | $1,553 | n/a |
UC2416 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $510 | $218 | n/a |
UC2416 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,494 | $29,062 | n/a |
UC2416 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $3,536 | $1,750 | n/a |
UC2416 # 07 Y:2024 | 07 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $294 | $139 | n/a |
UC2416 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $240,811 | $2,527,500 | n/a |
UC2416 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $80,097 | $301,647 | n/a |
UC2416 # 10 Y:2024 | 10 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $55,311 | $819,496 | n/a |
TT0325 # 01 Y:2025 | 01 | 2025 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $242,348 | $1,045,217 | Not Implemented |
TT0325 # 02 Y:2025 | 02 | 2025 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $68,822 | $200,000 | Implemented |
TT0325 # 03 Y:2025 | 03 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $30,978 | $17,480 | Not Implemented |
TT0325 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,824 | $22,500 | Not Implemented |
TT0325 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,974 | $16,000 | Not Implemented |
TT0325 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,854 | $400 | Not Implemented |
TT0325 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,049 | $30,040 | Not Implemented |