Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,988
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0584 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,030 | $100 | n/a |
LE0584 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,504 | $600 | n/a |
LE0584 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,377 | $2,400 | n/a |
LE0584 # 06 Y:2025 | 06 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $5,000 | n/a |
LE0584 # 07 Y:2025 | 07 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,000 | $31,500 | n/a |
LE0584 # 08 Y:2025 | 08 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,045 | $30,000 | n/a |
TT0320 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,445 | $1,710 | n/a |
TT0320 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,320 | $15,000 | n/a |
TT0320 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,949 | $23,783 | n/a |
TT0320 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,087 | $6,080 | n/a |
TT0320 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,337 | $238,118 | n/a |
TT0320 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,037 | $75,000 | n/a |
TT0320 # 09 Y:2025 | 09 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,140 | $26,000 | n/a |
SJ0028 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,778 | $9,383 | n/a |
SJ0028 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,130 | $0 | n/a |
SJ0028 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,344 | $2,064 | n/a |
SJ0028 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $62 | n/a |
SJ0028 # 05 Y:2025 | 05 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,098 | $0 | n/a |
SU0562 # 01 Y:2024 | 01 | 2024 | DISCONNECT BALLASTS | $526 | $0 | n/a |
SU0562 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,090 | $0 | n/a |
SU0562 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $656 | $0 | n/a |
SU0562 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,064 | $120 | n/a |
SU0562 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $374 | $418 | n/a |
SU0562 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $632 | n/a |
SU0562 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $639 | $2,272 | n/a |