IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,843

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0128 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,849 $3,760 Not Implemented
SF0128 # 03 Y:1997 03 1997 ADD AREA LIGHTING SWITCHES $535 $850 Not Implemented
SF0128 # 04 Y:1997 04 1997 USE PHOTOCELL CONTROLS $1,929 $1,500 Not Implemented
SF0128 # 05 Y:1997 05 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $970 $1,500 Not Implemented
SF0128 # 06 Y:1997 06 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $5,094 $8,069 Not Implemented
SF0128 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $434 $1,440 Not Implemented
SF0128 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,081 $12,944 Implemented
SF0128 # 09 Y:1997 09 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $253 $25 Implemented
SF0128 # 10 Y:1997 10 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $521 $300 Implemented
OR0308 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $3,430 $0 Implemented
OR0308 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,148 $6,433 Implemented
OR0308 # 05 Y:1997 05 1997 REPLACE BOILER $5,250 $21,300 Not Implemented
OR0308 # 06 Y:1997 06 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,820 $1,945 Not Implemented
BD0098 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $3,003 $2,400 Not Implemented
BD0098 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $1,894 $390 Implemented
BD0098 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $902 $300 Implemented
BD0098 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $484 $1,510 Not Implemented
BD0098 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $464 $660 Implemented
BD0098 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $286 $0 Not Implemented
NC0125 # 01 Y:1997 01 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $34,969 $195,000 Not Implemented
NC0125 # 02 Y:1997 02 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,740 $1,600 Not Implemented
NC0125 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,586 $0 Not Implemented
NC0125 # 04 Y:1997 04 1997 INSTALL SKYLIGHTS $7,876 $40,250 Not Implemented
NC0128 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $92 $140 Not Implemented
NC0128 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $445 $1,260 Not Implemented