IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,645

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1923 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $8,272 $1,300 Implemented
LS1923 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $18,500 $12,889 Implemented
LS1923 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,170 $13,688 Implemented
LS1923 # 05 Y:2023 05 2023 REPLACE BOILER $4,808 $10,080 Implemented
CW0129 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $10,973 $2,300 n/a
CW0129 # 02 Y:2023 02 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,901 $86,580 n/a
CW0129 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,343 $37,000 n/a
CW0129 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $180 n/a
CW0129 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,872 $21,000 n/a
CW0129 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,398 $72,618 n/a
UW2318 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $67 $180 Implemented
UW2318 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $376 $5,862 Not Implemented
UW2317 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
UW2317 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $658 $1,096 Implemented
UW2317 # 03 Y:2023 03 2023 INSTALL STORM WINDOWS AND DOORS $156 $1,901 Implemented
UW2317 # 04 Y:2023 04 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $31,756 $1,000,000 Implemented
UW2317 # 05 Y:2023 05 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $30,104 $300,000 Implemented
UD1068 # 01 Y:2023 01 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $529 $0 Not Implemented
UD1068 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $425 $0 Not Implemented
UD1068 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,164 $0 Not Implemented
UD1068 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,629 $100 Implemented
UD1068 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,431 $994 Not Implemented
UD1068 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $7,530 $4,236 Not Implemented
UC2314 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,543 $0 n/a
UC2314 # 02 Y:2023 02 2023 PAY UTILITY BILLS ON TIME $3,211 $0 n/a