IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,645

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0234 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $90 $400 Implemented
UU0234 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $63 $305 Not Implemented
UL2309 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,305 $2,688 Implemented
UL2309 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $957 $1,596 Implemented
UL2309 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,637 $0 Implemented
UL2309 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,370 $18,360 Implemented
UL2309 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $194,066 $1,198,885 Not Implemented
UL2309 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,607 $1,000 Not Implemented
UL2309 # 07 Y:2023 07 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,813 $15,000 Not Implemented
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 Implemented
OR0776 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,031 $18,336 Not Implemented
OR0776 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $41,797 $5,903 Not Implemented
MUWT04 # 01 Y:2023 01 2023 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $7,630 $31,680 Not Implemented
MUWT04 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30 $26 Not Implemented
MUWT04 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,150 $11,550 Not Implemented
MUWT04 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $64 $0 Implemented
MUWT04 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $58 $262 Not Implemented
MUWT04 # 06 Y:2023 06 2023 USE RADIANT HEATER FOR SPOT HEATING $4,579 $9,361 Not Implemented
OR0775 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $563 $261 Not Implemented
OR0775 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,277 $41,745 Not Implemented
OR0774 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $27,206 $88,913 Not Implemented
OR0774 # 02 Y:2023 02 2023 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $22,803 $17,436 Not Implemented
OR0774 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,951 $10,710 Not Implemented
OR0774 # 04 Y:2023 04 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,255 $1,480 Not Implemented
AM0889 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $1,550 Implemented