Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,645
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0343 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,726 | $2,400 | n/a |
MZ0343 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $126,570 | $196,842 | n/a |
MZ0343 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $175,679 | $545,812 | n/a |
MA0862 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,262 | $30,900 | n/a |
MA0862 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,114 | $20,600 | n/a |
MA0862 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,416 | $78,169 | n/a |
MA0862 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,461 | $14,400 | n/a |
MA0862 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,059 | $800 | n/a |
MA0862 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,570 | $2,160 | n/a |
NT0013 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $71,747 | $106,919 | Implemented |
NT0013 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,755 | $21,512 | Implemented |
NT0013 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $10,076 | $5,043 | Not Implemented |
NT0013 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $49,000 | $83,421 | Implemented |
NT0013 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $17,430 | $54,000 | Implemented |
NT0013 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,102 | $0 | Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,690 | $38,085 | Not Implemented |
NL0080 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,846 | $4,160 | Implemented |
NL0080 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,000 | Implemented |
NL0080 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $761 | $560 | Not Implemented |
NL0080 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $660 | Implemented |
NL0080 # 07 Y:2023 | 07 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $423 | $844 | Implemented |
NL0080 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $420 | Implemented |
NL0080 # 09 Y:2023 | 09 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $171 | $80 | Implemented |
SJ0006 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $132,467 | $665,395 | Not Implemented |