Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,636
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0636 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $861 | $383 | n/a |
SF0636 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $17,875 | $9,541 | n/a |
SF0636 # 08 Y:2025 | 08 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,982 | $16,494 | n/a |
SF0636 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,776 | $58,115 | n/a |
SF0636 # 10 Y:2025 | 10 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $35,783 | $137,500 | n/a |
SF0636 # 11 Y:2025 | 11 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,760 | $7,144 | n/a |
SF0636 # 12 Y:2025 | 12 | 2025 | HEAT WATER WITH EXHAUST HEAT | $14,524 | $59,559 | n/a |
SF0636 # 13 Y:2025 | 13 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,100,943 | $9,436,593 | n/a |
SF0636 # 14 Y:2025 | 14 | 2025 | REPLACE BOILER | $57,843 | $735,132 | n/a |
MZ0377 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,928 | $9,400 | n/a |
MZ0377 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $498 | $415 | n/a |
MZ0377 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $871 | $0 | n/a |
MZ0377 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,340 | $2,300 | n/a |
MZ0377 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $200 | n/a |
MZ0377 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,142 | $43,500 | n/a |
MZ0377 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,503 | $3,660 | n/a |
UF0630 # 01 Y:2025 | 01 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $66,329 | $8,820 | n/a |
UF0630 # 02 Y:2025 | 02 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $25,034 | $48,000 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $40,000 | n/a |
UF0630 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,264 | $14,760 | n/a |
UF0630 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,407 | $25,400 | n/a |
UF0630 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,256 | $2,120 | n/a |
UF0630 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $958 | $0 | n/a |