IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,636

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0277 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $712 $800 Implemented
TT0305 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $60 Implemented
TT0305 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82 $174 Not Implemented
TT0305 # 04 Y:2024 04 2024 AIR CONDITION ONLY SPACE NECESSARY $6,707 $1,060 Implemented
TT0305 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,366 $3,000 Not Implemented
TT0305 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $125 Implemented
UL2312 # 01 Y:2023 01 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $5,925 $0 Implemented
UL2312 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,419 $15,000 Implemented
UL2312 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Implemented
UL2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,620 Implemented
UL2312 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $167 $488 Not Implemented
UL2312 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,666 $224,516 Not Implemented
UL2312 # 07 Y:2023 07 2023 SHADE WINDOWS FROM SUMMER SUN $7,159 $34,500 Not Implemented
SD0643 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $424 Implemented
SD0643 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $55,833 $125,021 Not Implemented
SD0643 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $11,390 $0 Not Implemented
SD0643 # 04 Y:2024 04 2024 USE OPTIMUM TEMPERATURE $6,846 $0 Implemented
SD0643 # 05 Y:2024 05 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,058 $4,196 Not Implemented
SD0643 # 06 Y:2024 06 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,190 $4,926 Not Implemented
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 Implemented
SD0643 # 08 Y:2024 08 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,956 $2,000 Not Implemented
IP0178 # 01 Y:2023 01 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,915 $824 Not Implemented
IP0178 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,293 $2,142 Not Implemented
IP0178 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,674 $4,752 Not Implemented
IP0178 # 04 Y:2023 04 2023 REPLACE BOILER $5,185 $20,824 Not Implemented