Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,636
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0609 # 07 Y:2023 | 07 | 2023 | USE OPTIMUM THICKNESS INSULATION | $8,652 | $21,442 | Not Implemented |
SF0609 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,153 | $9,827 | Not Implemented |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | Not Implemented |
CI0023 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,738 | $658,288 | n/a |
CI0023 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $45,480 | $17,533 | n/a |
CI0023 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $13,894 | $30,000 | n/a |
CI0023 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,902 | $300 | n/a |
CI0023 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $7,791 | $2,625 | n/a |
CI0023 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,881 | $2,299 | n/a |
CI0023 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,670 | $7,500 | n/a |
CI0023 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,797 | $5,000 | n/a |
SU0538 # 01 Y:2023 | 01 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,617 | $0 | n/a |
SU0538 # 02 Y:2023 | 02 | 2023 | DISCONNECT BALLASTS | $6,608 | $0 | n/a |
SU0538 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,300 | $407 | n/a |
SU0538 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,828 | $1,591 | n/a |
SU0538 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,330 | $15,421 | n/a |
SU0538 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $870 | $725 | n/a |
SU0538 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,329 | $3,039 | n/a |
UU0230 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,018 | $26,647 | Implemented |
UU0230 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,818 | $12,930 | Implemented |
UU0230 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,861 | $1,200 | Implemented |
UU0230 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,277 | $2,970 | Implemented |
UU0230 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $4,607 | $4,819 | Implemented |
UU0230 # 06 Y:2023 | 06 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,985 | $11,730 | Not Implemented |
UU0230 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,123 | $20,174 | Implemented |