Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141,237
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0658 # 01 Y:2024 | 01 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $46,042 | $4,000 | n/a |
WM0219 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $918 | $2,370 | n/a |
WM0219 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,556 | $0 | n/a |
WM0219 # 04 Y:2024 | 04 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,229 | $0 | n/a |
WM0219 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,325 | $6,594 | n/a |
WM0219 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,902 | $3,000 | n/a |
WM0219 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,918 | $200,000 | n/a |
UL2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,533 | $548,395 | n/a |
UL2403 # 08 Y:2024 | 08 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $680 | $0 | n/a |
UL2403 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,568 | $3,839 | n/a |
UL2403 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $181 | $779 | n/a |
UL2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,498 | $1,785 | n/a |
UL2403 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,803 | $0 | n/a |
UL2403 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,407 | $9,750 | n/a |
UL2403 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,359 | $12,025 | n/a |
UL2403 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,606 | $77,327 | n/a |
UF0611 # 08 Y:2024 | 08 | 2024 | INSTALL TURBULATORS | $2,454 | $3,750 | n/a |
UF0611 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,650 | $720 | n/a |
UF0611 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,901 | $7,320 | n/a |
UF0611 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,576 | $19,104 | n/a |
UF0611 # 04 Y:2024 | 04 | 2024 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $26,100 | $0 | n/a |
UF0611 # 03 Y:2024 | 03 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $30,134 | $5,900 | n/a |
UF0611 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $36,892 | $25,400 | n/a |
UF0611 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $99,213 | $111,120 | n/a |
UD1081 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,626 | $7,875 | n/a |