Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,876
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0212 # 05 Y:2025 | 05 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $9,826 | $39,500 | n/a |
IP0212 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,292 | $84,000 | n/a |
IP0212 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $914 | $593 | n/a |
IP0212 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $35,687 | $360 | n/a |
IP0212 # 01 Y:2025 | 01 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,010 | $0 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
WV0681 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,629 | $34,630 | n/a |
WV0681 # 02 Y:2025 | 02 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $9,972 | $8,140 | n/a |
WV0681 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,352 | $3,890 | n/a |
WV0681 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,385 | $5,940 | n/a |
WV0681 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,725 | $848 | n/a |
WV0681 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $1,989 | $4,797 | n/a |
WV0681 # 07 Y:2025 | 07 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,642 | $5,200 | n/a |
WV0681 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $308 | $675 | n/a |
UA0297 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $165,904 | $2,630,520 | n/a |
UA0297 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $38,546 | $5,696 | n/a |
UA0297 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,160 | $28,210 | n/a |
UA0297 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,778 | $7,744 | n/a |
UA0297 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,389 | $670 | n/a |
UA0297 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,275 | $16,734 | n/a |
UA0297 # 07 Y:2025 | 07 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $2,765 | $316 | n/a |
MS0448 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,205 | $72,000 | n/a |