Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,570
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0186 # 01 Y:1986 | 01 | 1986 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,459 | $0 | Implemented |
UD0186 # 02 Y:1986 | 02 | 1986 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $4,586 | $2,812 | Not Implemented |
UD0186 # 03 Y:1986 | 03 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,369 | $26,000 | Implemented |
TS0032 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,844 | $1,500 | Not Implemented |
TS0032 # 02 Y:1986 | 02 | 1986 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,661 | $4,000 | Not Implemented |
TS0032 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $635 | $178 | Not Implemented |
TS0032 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,690 | $0 | Not Implemented |
MA0051 # 01 Y:1986 | 01 | 1986 | INSTALL SET-BACK TIMERS | $377 | $75 | Implemented |
MA0051 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,235 | $248 | Implemented |
MA0051 # 03 Y:1986 | 03 | 1986 | REPAIR OR REPLACE STEAM TRAPS | $14,400 | $650 | Implemented |
MA0051 # 04 Y:1986 | 04 | 1986 | COVER OPEN TANKS | $12,580 | $1,239 | Not Implemented |
MA0051 # 05 Y:1986 | 05 | 1986 | INSTALL EFFICIENT RECTIFIERS | $8,784 | $40,000 | Implemented |
MA0052 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $41 | Not Implemented |
MA0052 # 02 Y:1986 | 02 | 1986 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $589 | $900 | Implemented |
MA0052 # 03 Y:1986 | 03 | 1986 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $375 | $0 | Implemented |
MA0052 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $449 | $1,060 | Not Implemented |
MA0052 # 06 Y:1986 | 06 | 1986 | HEAT WATER WITH EXHAUST HEAT | $383 | $1,500 | Implemented |
KU0182 # 01 Y:1986 | 01 | 1986 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $109,167 | $1,000,000 | Not Implemented |
KU0182 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,883 | $10,000 | Implemented |
KU0182 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,269 | $20 | Not Implemented |
KU0182 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $700 | Implemented |
KU0182 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $3,144 | $3,000 | Implemented |
KU0182 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $882 | $2,000 | Implemented |
KU0182 # 07 Y:1986 | 07 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $801 | $1,400 | Not Implemented |
KU0182 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $160 | $0 | Implemented |