IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0097 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,685 $275 Implemented
IP0097 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $7,330 $4,122 Not Implemented
IP0097 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $639 Not Implemented
IP0097 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $15,632 Implemented
IP0097 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,428 $6,125 Not Implemented
IP0097 # 09 Y:2018 09 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,786 $1,576 Not Implemented
SD0559 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $534,492 $1,824,000 Not Implemented
SD0559 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $46,211 $152,126 Not Implemented
SD0559 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,481 $37,900 Not Implemented
SD0559 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,884 $14,697 Not Implemented
SD0559 # 05 Y:2018 05 2018 REDUCE EXCESSIVE BOILER BLOWDOWN $8,114 $11,774 Not Implemented
SD0559 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,587 $600 Not Implemented
WV0555 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,162 $53,700 Implemented
WV0555 # 02 Y:2018 02 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,502 $18,000 Implemented
WV0555 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,339 $6,000 Not Implemented
WV0555 # 04 Y:2018 04 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $5,001 $25,000 Implemented
WV0555 # 05 Y:2018 05 2018 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,502 $7,080 Not Implemented
WV0555 # 06 Y:2018 06 2018 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,455 $1,000 Implemented
WV0555 # 07 Y:2018 07 2018 ADD AREA LIGHTING SWITCHES $2,327 $4,400 Not Implemented
WV0555 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,289 $3,732 Implemented
WV0555 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $507 $638 Not Implemented
SF0514 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $0 Implemented
SF0514 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,866 $0 Not Implemented
SF0514 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,280 $0 Not Implemented
SF0514 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,491 $0 Not Implemented