Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,574
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0097 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,685 | $275 | Implemented |
IP0097 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,330 | $4,122 | Not Implemented |
IP0097 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $183 | $639 | Not Implemented |
IP0097 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,259 | $15,632 | Implemented |
IP0097 # 08 Y:2018 | 08 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,428 | $6,125 | Not Implemented |
IP0097 # 09 Y:2018 | 09 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,786 | $1,576 | Not Implemented |
SD0559 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $534,492 | $1,824,000 | Not Implemented |
SD0559 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $46,211 | $152,126 | Not Implemented |
SD0559 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,481 | $37,900 | Not Implemented |
SD0559 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,884 | $14,697 | Not Implemented |
SD0559 # 05 Y:2018 | 05 | 2018 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,114 | $11,774 | Not Implemented |
SD0559 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,587 | $600 | Not Implemented |
WV0555 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,162 | $53,700 | Implemented |
WV0555 # 02 Y:2018 | 02 | 2018 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,502 | $18,000 | Implemented |
WV0555 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $6,339 | $6,000 | Not Implemented |
WV0555 # 04 Y:2018 | 04 | 2018 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $5,001 | $25,000 | Implemented |
WV0555 # 05 Y:2018 | 05 | 2018 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,502 | $7,080 | Not Implemented |
WV0555 # 06 Y:2018 | 06 | 2018 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,455 | $1,000 | Implemented |
WV0555 # 07 Y:2018 | 07 | 2018 | ADD AREA LIGHTING SWITCHES | $2,327 | $4,400 | Not Implemented |
WV0555 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,289 | $3,732 | Implemented |
WV0555 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $507 | $638 | Not Implemented |
SF0514 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,086 | $0 | Implemented |
SF0514 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,866 | $0 | Not Implemented |
SF0514 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,280 | $0 | Not Implemented |
SF0514 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,491 | $0 | Not Implemented |