Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,615
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0659 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,706 | $22,711 | n/a |
GT0659 # 02 Y:1999 | 02 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,484 | $0 | n/a |
GT0659 # 04 Y:1999 | 04 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,123 | $400 | n/a |
GT0659 # 01 Y:1999 | 01 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $88,180 | $220,000 | n/a |
GT0659 # 06 Y:1999 | 06 | 1999 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $45,013 | $120,000 | n/a |
TN0648 # 10 Y:1999 | 10 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,645 | $19,080 | Not Implemented |
TN0648 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $12,600 | $6,880 | Not Implemented |
TN0648 # 02 Y:1999 | 02 | 1999 | INCREASE AMOUNT OF CONDENSATE RETURNED | $197,660 | $27,450 | Implemented |
UF0240 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $983 | $0 | Implemented |
UF0240 # 03 Y:1999 | 03 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $184 | $0 | Implemented |
UF0240 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,086 | $0 | Implemented |
TN0652 # 09 Y:1999 | 09 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $28,970 | $300 | Not Implemented |
TN0652 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $4,000 | Implemented |
TN0652 # 08 Y:1999 | 08 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $96,250 | $400,000 | Not Implemented |
TN0652 # 02 Y:1999 | 02 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $34,710 | $27,240 | Not Implemented |
TN0652 # 10 Y:1999 | 10 | 1999 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,210 | $10,000 | Not Implemented |
TN0652 # 06 Y:1999 | 06 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $4,000 | $100 | Implemented |
OD0150 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $3,660 | Not Implemented |
OD0150 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $20 | Not Implemented |
OD0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $400 | Not Implemented |
OD0150 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,354 | $9,564 | Not Implemented |
GT0678 # 08 Y:1999 | 08 | 1999 | COMBINE UTILITY METERS | $7,560 | $7,500 | Not Implemented |
GT0678 # 02 Y:1999 | 02 | 1999 | REDUCE EXCESSIVE BOILER BLOWDOWN | $920 | $900 | Not Implemented |
GT0678 # 05 Y:1999 | 05 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,447 | $21,000 | Not Implemented |
GT0678 # 07 Y:1999 | 07 | 1999 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $44,185 | $120,000 | Not Implemented |