IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,554

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0208 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,700 Implemented
NC0208 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $200 Not Implemented
NC0208 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $113 $200 Implemented
NC0208 # 02 Y:2001 02 2001 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $45,000 $21,500 Not Implemented
NC0208 # 01 Y:2001 01 2001 USE OPTIMUM THICKNESS INSULATION $2,937 $4,950 Not Implemented
NC0208 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $792 $100 Implemented
AS0294 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,492 $15,000 Implemented
AS0294 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,366 $6,076 Implemented
AS0294 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,070 Implemented
AS0294 # 04 Y:2001 04 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
MS0198 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $502 $161 Implemented
MS0198 # 02 Y:2001 02 2001 INSTALL TIMERS AND/OR THERMOSTATS $33,540 $3,025 Not Implemented
MS0198 # 01 Y:2001 01 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $51,081 $50,126 Implemented
MS0198 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,123 $120 Implemented
MS0194 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,507 $28,607 n/a
MS0195 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,968 $1,701 Not Implemented
MS0195 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,494 $1,000 Implemented
MS0195 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $74 $119 Implemented
MS0194 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $26,678 $32,890 n/a
MS0194 # 07 Y:2001 07 2001 DISCONNECT BALLASTS $824 $1,560 Not Implemented
MS0194 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,241 $2,240 Not Implemented
MS0194 # 08 Y:2001 08 2001 INSTALL TIMERS AND/OR THERMOSTATS $536 $355 Not Implemented
MS0194 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $75,156 $10,000 n/a
MS0194 # 06 Y:2001 06 2001 INSTALL TIMERS AND/OR THERMOSTATS $856 $355 Not Implemented
MS0194 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,856 $4,050 Not Implemented