IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0078 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,761 $22,500 Not Implemented
IC0192 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 n/a
MZ0073 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,600 $12,500 Not Implemented
IC0192 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,672 $128,355 n/a
IC0192 # 08 Y:2011 08 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $133 $0 n/a
MZ0073 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,500 $15,300 Not Implemented
DL0078 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $77,835 $42,650 Implemented
IC0192 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $2,650 n/a
IC0192 # 07 Y:2011 07 2011 ADJUST BURNERS FOR EFFICIENT OPERATION $3,224 $1,612 n/a
MA0685 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,634 $7,050 Not Implemented
DL0078 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,872 $165,720 Not Implemented
IC0192 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $408 $3,264 n/a
DL0078 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,553 $42,800 Not Implemented
IC0192 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,171 $190,302 n/a
DL0078 # 06 Y:2011 06 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $14,637 $800 Not Implemented
MA0685 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $3,520 $9,425 Implemented
MA0685 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $2,713 $6,300 Implemented
MA0685 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $898 $1,280 Not Implemented
MA0685 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,714 $0 Not Implemented
MZ0073 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $638 $760 Implemented
DL0078 # 01 Y:2011 01 2011 REPLACE BOILER $123,207 $900,000 Not Implemented
DL0078 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $191,452 $500,000 Not Implemented
MZ0073 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $9,393 $4,500 Not Implemented
DL0078 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,285 $28,500 Not Implemented
IC0192 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $2,264 n/a