IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,377

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0244 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,371 $0 Implemented
MZ0244 # 08 Y:2017 08 2017 RECOVER WASTE HEAT FROM EQUIPMENT $966 $4,050 Not Implemented
MZ0244 # 02 Y:2017 02 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,898 $46,100 Implemented
MZ0244 # 05 Y:2017 05 2017 USE COMPRESSOR AIR FILTERS $2,071 $900 Implemented
MZ0244 # 09 Y:2017 09 2017 USE SOLAR HEAT TO HEAT WATER $5,690 $96,550 Not Implemented
MZ0244 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,566 $0 Implemented
MZ0244 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,749 $17,550 Implemented
MZ0244 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,568 $2,900 Implemented
MZ0244 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $150 $280 Implemented
UF0514 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,847 $20,000 Implemented
UF0514 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,432 $0 Implemented
UF0514 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,154 $30,844 Implemented
UF0514 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $4,320 $0 Implemented
UF0514 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,740 $2,882 Implemented
UF0514 # 03 Y:2017 03 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,710 $7,580 Not Implemented
UF0514 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,693 $6,775 Implemented
UA0187 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,441 $1,892 Not Implemented
UA0187 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,032 $136,663 Implemented
UA0187 # 06 Y:2017 06 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $88,008 $0 Implemented
UA0187 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,219 $6,260 Implemented
UA0187 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $67,895 $250 Not Implemented
UA0187 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $33,082 $14,405 Not Implemented
UU0126 # 03 Y:2017 03 2017 REPLACE BOILER $26,315 $176,427 Not Implemented
UU0126 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,358 $90 Implemented
UU0126 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,977 $8,120 Not Implemented