Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0531 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,498 $886 Not Implemented
SF0531 # 06 Y:2018 06 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $20,839 $15,682 Not Implemented
SF0531 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,968 $3,477 Not Implemented
SF0531 # 09 Y:2018 09 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $15,854 $35,361 Not Implemented
SF0531 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,404 $82,459 Not Implemented
SF0531 # 05 Y:2018 05 2018 INSTALL STEAM TRAP $9,614 $6,613 Not Implemented
SF0531 # 08 Y:2018 08 2018 REPAIR AND ELIMINATE STEAM LEAKS $18,580 $32,000 Not Implemented
SF0531 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $88,691 $23,292 Not Implemented
SF0531 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,894 $0 Not Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
NL0027 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $4,500 $2,500 Not Implemented
NL0027 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $1,050 Not Implemented
NL0027 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,840 $74,980 Implemented
NL0027 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $326 $1,000 Implemented
OK0993 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $626 $5,696 Implemented
AM0766 # 05 Y:2018 05 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,260 $0 Not Implemented
AM0766 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $1,000 Not Implemented
AM0766 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $0 Not Implemented
OK0993 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $11,376 $41,363 Implemented
IP0111 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $767 $0 Not Implemented
IP0111 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $217 Implemented