ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0134 # 04 Y:1991 | 04 | 1991 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $29,000 | $114,000 | Not Implemented |
AM0134 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,610 | $0 | Not Implemented |
AM0135 # 03 Y:1991 | 03 | 1991 | INCREASE AMOUNT OF CONDENSATE RETURNED | $870 | $715 | Implemented |
AM0134 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,677 | $7,240 | Not Implemented |
AM0134 # 01 Y:1991 | 01 | 1991 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $91,770 | $0 | Not Implemented |
AM0135 # 09 Y:1991 | 09 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $120 | $75 | Implemented |
AM0135 # 07 Y:1991 | 07 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $320 | $0 | Implemented |
AM0134 # 08 Y:1991 | 08 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,410 | $3,820 | Not Implemented |
AM0135 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,190 | $100 | Implemented |
AM0134 # 03 Y:1991 | 03 | 1991 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,080 | $43,900 | Not Implemented |
AM0135 # 06 Y:1991 | 06 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $440 | $315 | Implemented |
AM0134 # 05 Y:1991 | 05 | 1991 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $14,690 | $0 | Not Implemented |
AM0135 # 01 Y:1991 | 01 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,330 | $6,532 | Implemented |
AM0134 # 07 Y:1991 | 07 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,610 | $0 | Not Implemented |
AM0135 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $840 | $1,009 | Implemented |
AM0135 # 05 Y:1991 | 05 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $630 | $340 | Implemented |
AM0135 # 08 Y:1991 | 08 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $165 | $0 | Implemented |
AM0132 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $150 | $0 | Not Implemented |
AM0133 # 03 Y:1991 | 03 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $750 | $627 | Not Implemented |
AM0132 # 05 Y:1991 | 05 | 1991 | IMPROVE LUBRICATION PRACTICES | $704 | $0 | Not Implemented |
AM0133 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $690 | $300 | Not Implemented |
AM0132 # 02 Y:1991 | 02 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,700 | $78,000 | Not Implemented |
AM0133 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $0 | Not Implemented |
AM0132 # 03 Y:1991 | 03 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,300 | $0 | Not Implemented |
AM0132 # 04 Y:1991 | 04 | 1991 | PAY UTILITY BILLS ON TIME | $1,315 | $0 | Not Implemented |